Spike Storm (Battles)

For other uses, see Spike Storm (disambiguation).
Spike Storm
Portrait of Spike Storm
Icon of Spike Storm Ability: Lays down a thick carpet of Spikes over the whole track.
Portrait of Spike Storm
Icon of Spike Storm Lays down a thick carpet of spikes over the whole track.
Tower Path Tier Cost
Spike Factory 2 4 Flash: $6,500
Mobile: $6,000

Spike Storm is the Spike Factory's path 2 tier 4 upgrade in Bloons TD Battles. It unlocks an Activated Ability that dispenses 180 spike piles (100 in the Flash version) randomly across all paths. Each pile lasts for 8 seconds (5–8 seconds at random in the Flash version), has 5 pierce (10 pierce in the Flash version), deals 1 base damage, and deals +3 damage to MOAB-Class Bloons. It benefits from Bigger Stacks and White Hot Spikes in the same way as its main attack. It has a 30-second cooldown (40 seconds in the Flash version).

Costs and sell values

edit
Tiers Mobile version Flash version
Cost Sell value Cost Sell value
0-4 $10,150 $8,120 $12,300 $8,610
1-4 $10,650 $8,520 $13,000 $9,100
2-4 $11,150 $8,920 $13,900 $9,730

Update history

edit
For a complete list of Spike Factory changes, see Update history:Spike Factory (Battles).

Mobile version

  This article or section uses Cargo to generate its content. It will automatically fill up as other articles are completed.
To add to this section, create the articles it is looking up. Do not add content to this section manually and do not remove this notice until you are sure this section is complete.
  •   Overall cost reduced by $250 (due to cost changes for previous tiers)
  •   Overall cost reduced by $450 (due to cost changes for previous tiers)
  •   Overall cost reduced by $300 (due to cost changes for previous tiers)
  •   Ability: cooldown reduced ― 40s → 30s
  •   Overall cost reduced by $200 (due to cost changes for previous tiers)
  •   Overall cost reduced by $300 (due to cost changes for previous tiers)
  •   Ability: spike pile count reduced ― 200 → 180
  •   Ability: damage to MOAB-Class increased ― 2 → 3
  •   Upgrade cost increased ― $6,500 → $6,700
    •   Overall cost increased by $50 (due to cost changes for previous tiers)
  •   Upgrade cost reduced ― $6,700 → $6,000

Flash version

  This article or section uses Cargo to generate its content. It will automatically fill up as other articles are completed.
To add to this section, create the articles it is looking up. Do not add content to this section manually and do not remove this notice until you are sure this section is complete.

The editor who added this notice elaborates: Functionality to be added
edit